This content is not included in
your SAE MOBILUS subscription, or you are not logged in.
International Space Station Temperature and Humidity Control Subsystem Verification for Node 1
Technical Paper
2007-01-3185
ISSN: 0148-7191, e-ISSN: 2688-3627
Annotation ability available
Sector:
Language:
English
Abstract
The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the nominal operation of the Node 1 THC subsystem design. The paper will also provide a discussion of the detailed Element Verification methodologies for nominal operation of the Node 1 THC subsystem operations utilized during the Qualification phase.
Authors
Topic
Citation
Williams, D., "International Space Station Temperature and Humidity Control Subsystem Verification for Node 1," SAE Technical Paper 2007-01-3185, 2007, https://doi.org/10.4271/2007-01-3185.Also In
References
- “Prime Item Development Specification for Node 1” November 20 2002
- “Space Station Program Node Element 1 to Node Element 3 Interface Control Document, Part 1” August 24 2005
- “Node 1 Element to U.S. Laboratory Element Interface Control Document, Part 1” December 10 2004
- “Node 1 Element to Airlock Element Interface Control Document, Part 1” January 5 2002
- “United States On-Orbit Segment to Italian Mini Pressurized Logistics Module Interface Control Document, Part 1” December 31 2002
- “Pressurized Mating Adapter 2 & 3 to United States Pressurized Elements (Node 1 to PMA-3) Interface Control Document, Part 1, Appendix D” June 30 2006
- “Resource Node 1 to Pressurized Mating Adapter-1 Interface Control Document, Part 1” December 20 2002
- Boeing - Huntington Beach “International Space Station Node 1 Cabin Ventilation ECLSS Verification Analysis Report” April 1 1998
- Boeing - Huntington Beach “International Space Station Particulate and Microbe Removal ECLSS Verification Analysis Report” January 30 1998
- Boeing - Huntington Beach “International Space Station Node 1 Intermodule Ventilation and Temperature Control ECLSS Verification Analysis Report” February 6 1998