This content is not included in
your SAE MOBILUS subscription, or you are not logged in.
International Space Station Atmosphere Control and Supply, Atmosphere Revitalization, and Water Recovery and Management Subsystem - Verification for Node 1
Technical Paper
2007-01-3102
ISSN: 0148-7191, e-ISSN: 2688-3627
Annotation ability available
Sector:
Language:
English
Abstract
The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the nominal operation of the Node 1 ACS, AR, and WRM design and detailed Element Verification methodologies utilized during the Qualification phase for Node 1.
Authors
Topic
Citation
Williams, D., "International Space Station Atmosphere Control and Supply, Atmosphere Revitalization, and Water Recovery and Management Subsystem - Verification for Node 1," SAE Technical Paper 2007-01-3102, 2007, https://doi.org/10.4271/2007-01-3102.Also In
References
- “Prime Item Development Specification for Node 1” November 20 2002
- “Space Station Program Node Element 1 to Node Element 3 Interface Control Document, Part 1” SSP 41140 August 24 2005
- “Node 1 Element to U.S. Laboratory Element Interface Control Document, Part 1” SSP 41141 December 10 2004
- “Node 1 Element to Airlock Element Interface Control Document, Part 1” SSP 41145 January 5 2002
- “United States On-Orbit Segment to Italian Mini Pressurized Logistics Module Interface Control Document, Part 1” SSP 42007 December 31 2002
- “Resource Node 1 to Pressurized Mating Adapter-1 Interface Control Document, Part 1” SSP 42122 December 20 2002
- Beach Boeing - Huntington “International Space Station Node 1 Pressure Monitoring and Equalization ECLSS Verification Analysis Report” February 13 1988
- Beach Boeing - Huntington “International Space Station Node 1 Atmosphere Sample Distribution Pressure Loss ECLSS Verification Analysis Report” February 13 1988
- Beach Boeing - Huntington “International Space Station Node 1 Atmosphere Control System Distribution Pressure Loss ECLSS Verification Analysis Report” January 30 1988
- Beach Boeing - Huntington “International Space Station Node 1 Water Recovery Management Pressure Loss ECLSS Verification Analysis Report” January 30 1988
- “ISS Node 1 Fuel Cell and Waste Water Distribution Inspection Verification” March 12 1998
- Erwin, Lowell email titled “Data” April 3 1998
- “Pressure Equalization of Vestibule with Node 1” August 11 1998