This content is not included in
your SAE MOBILUS subscription, or you are not logged in.
Energy and Productivity, Two Sides of a Coin in the U.S. Auto Industry
Technical Paper
2006-01-0833
ISSN: 0148-7191, e-ISSN: 2688-3627
Annotation ability available
Sector:
Language:
English
Abstract
Productivity is a significant issue in the US auto industry that is often viewed as the success or failure that a vehicle assembly plant can make or break their production schedule. In other words, productivity is often looked at in terms of the number of assembled vehicles produced per year. While high production volume is an important indicator in a manufacturing environment, it certainly does not necessarily imply high productivity. By definition, Productivity is the ratio of output (number of vehicles produced) divided by all input resources such as labor, material, capital, overhead, health and energy costs. Improvement in productivity can be achieved in two ways: a reduction of inputs while output remains constant, or an increase in output while inputs remain constant. Energy is the single most controllable cost parameter in the input parameters of the productivity equation. In today's competitive marketplace, energy efficiency can provide means to improve productivity through reducing the manufacturing energy cost. This paper addresses this missing link between energy and productivity in U.S. auto industry. Furthermore, it outlines a methodological approach for driving improvements in energy usage in a major vehicle assembly plant in US. It is hoped that efforts in this direction would pave the road to better understand role of energy as an important factor in the assembly plant's vision to productivity improvement.
Authors
Citation
Alkadi, N., "Energy and Productivity, Two Sides of a Coin in the U.S. Auto Industry," SAE Technical Paper 2006-01-0833, 2006, https://doi.org/10.4271/2006-01-0833.Also In
References
- Heizer, J. Render, B. “Operations Management” Sixth Prentice Hall, Inc. Upper Saddle River, NJ 2001
- The Harbour Report North America 2005
- Levinsohn, J. “Productivity in the U.S. Auto Industry: Evidence from multiple perspectives” University of Michigan, National Bureau of Economic Research 1997
- Galitsky, C. Worrell, E. “Energy Efficiency Improvement and Cost Saving Opportunities for the Vehicle Assembly Industry- An ENERGY STAR® Guide for Energy and Plant Managers” Environmental Energy Technologies Division U.S. Environmental Protection Agency 2003
- Alkadi, N. Fattah, A.R. Nosier, M.A. Shahien, M.A “The Characteristics Of Cylindrical Water-Cooled Furnaces When Burning Liquid, Gaseous, Or Dual Liquid-Gas Fuels” Joint International Combustion Symposium Kauai, Hawaii September 2001
- Kissock, K. Hallinan, K. Bader, W. “The Inside-Out Approach For Identifying Industrial Energy And Waste Reduction Opportunities” Journal of Strategic Planning for Energy and Environment Association of Energy Engineers 21 1 2001 6
- “Inside-Out Analysis Identifies Energy and Cost Savings Opportunities at Metal Casting Plant, in Ford Cleveland Casting Plant (CCP) in Cleveland, Ohio” 2003
- JHRA “The Improvement Engine” Productivity Press Portland, OR 1995
- Womack, J.P. Jones, D.T. Roos, D. “The Machine That Changed The World” Harper Perennial NY 1991
- Lindborg, H. J. “The Basics of Cross Functional Teams” Quality Resources NY 1997