This content is not included in
your SAE MOBILUS subscription, or you are not logged in.
Analysis of Crew Interaction with Long-Duration Plant Growth Experiment
Technical Paper
2003-01-2482
ISSN: 0148-7191, e-ISSN: 2688-3627
Annotation ability available
Sector:
Language:
English
Abstract
The Biomass Production System (BPS) was flown on the ISS for 73 days as part of the Increment 4 mission. To obtain maximum benefit from the long mission duration, numerous manual crew procedures were incorporated into the BPS experiments. These procedures included gas sampling, root module priming, harvesting, pollination, filter cleaning, water refill, and water sampling. On-orbit crew assessments were filled out for each of these procedures to evaluate the ability of BPS to accommodate them. The assessment asked questions about each phase of an activity and solicited recommendations for improvements. Further analysis of most procedures was provided by detailed video made on-orbit and multiple post-flight crew debriefs. Most assessments indicated no need for improvements, but a number of crew suggestions will be incorporated into hardware and procedure updates.
Authors
Topic
Citation
Morrow, R. and Stadler, J., "Analysis of Crew Interaction with Long-Duration Plant Growth Experiment," SAE Technical Paper 2003-01-2482, 2003, https://doi.org/10.4271/2003-01-2482.Also In
References
- Lagel, K. Morrow, R.C. Stutte, G. Sato, K. McLamb, B.W. Stolp, K. Chapman, D. Heathcote, D. Stadler, J. Berthold, R. Lee M. Cox. D. 2002 Panel discussion: Lessons learned during a long duration life science experiment on the ISS ASGSB Bulletin 16 74
- Megahed, A. 2002 The Use of Interactive 3D Simulation in Crew Training and Spaceflight Operations SAE Technical Paper Series Paper No. 02ICES-52
- Morrow, R.C., Frank, J.G. Stolp K.M. Lee. M.C. 2002 Biomass Production System (BPS) ground based performance testing. SAE Technical Paper Series 2002-01-2482
- NASA. 2002a U.S. Payload Operations Data File Management Plan Document SSP 58700
- NASA. 2002b Payload Training Implementation Plan Document SSP 58309