A Technique for Management of Multiple Programs in a Medium Size Engineering Department

620361

01/01/1962

Event
Pre-1964 SAE Technical Papers
Authors Abstract
Content
A workable approach to controlling fiscal and technical progress for multiple, diverse engineering projects is described. The system includes techniques for estimating cost and time requirements as well as monitoring and measuring activity on a weekly or monthly basis. The techniques were designed to minimize the paperwork required on the working engineer level, and to maximize visibility.
Meta TagsDetails
DOI
https://doi.org/10.4271/620361
Pages
10
Citation
Goldberg, B., "A Technique for Management of Multiple Programs in a Medium Size Engineering Department," SAE Technical Paper 620361, 1962, https://doi.org/10.4271/620361.
Additional Details
Publisher
Published
Jan 1, 1962
Product Code
620361
Content Type
Technical Paper
Language
English