Design Conveyor Belt with 5 DOF Connected to a Lattice Boom Crane for Transporting Concrete
Technical Paper
2016-01-8127
ISSN: 0148-7191, e-ISSN: 2688-3627
Annotation ability available
Sector:
Language:
English
Abstract
The aim of this paper is to establish the design process of a system that expedites concreting, the Topbelt. Two connected conveyors that provide five degrees of freedom are known as the Topbelt System. These two conveyors are suspended via a rope connection to a Lattice boom of a crane, Manitowoc 4100 S. The required concrete that should be handled by Topbelt is provided by a feeder. The suspended Topbelt system is capable of transporting concrete to levels of both higher and lower than the ground horizontal level. This concreting mechanism sweeps a circle of about 85-meter diameter, centering at the crane swing on the swing plane level.
The Topbelt is suspended using two winches, one of them is for keeping conveyor1 in its proper position and the other is applied to keep conveyor2 by a rope guide mechanism, which allows the rotational movement of conveyor2 with respect to conveyor1. Expediting concrete process in dam construction is the main advantages of the Topbelt system.
Topic
Citation
Bathaee, K. and Gholami, M., "Design Conveyor Belt with 5 DOF Connected to a Lattice Boom Crane for Transporting Concrete," SAE Technical Paper 2016-01-8127, 2016, https://doi.org/10.4271/2016-01-8127.Also In
References
- Ray , T.K. Mechanical Handling of Material Asian Books Private Limited 81-86299-47-5
- Rotec product line www.rotec-usa.com
- Manitowoc Crane (4100 S1) Operation and Service Manual Manitowoc co. Wisconsin, USA
- Dae , Suk Han ., Sung , Won Yoo ., Hyun , Sik Yoon ., Myung , Hyun Kim ., Sang , Hyun Kim . and Jae , Myung Lee 2011 Coupling Analysis of Finite Element and Finite Volume Method for the Design and Construction of FPSO Crane Journal of Automation in Construction 368 379
- Guangfu , Sun ., Michael , Kleeberger b. and Jie Liu, c. 2005 Complete Dynamic Calculation of Lattice Mobile Crane during Hoisting Motion Guangfu Journal of Mechanism and Machine Theory 40 447 466
- Safarzadeh , D. and Sulaiman Sh. 2011 The Design Process of a Self-propelled Floor Crane Journal of Terramechanics 48 157 168
- Shapiro Howard I. ., Shapiro jay p. and Shapiro Lawrence k. 1999 Cranes and Derricks Mc Graw Hill 0-07-0577