Safety Cultural Transformation at Ford South American Manufacturing Plants

2012-36-0111

10/02/2012

Event
21st SAE Brasil International Congress and Exhibition
Authors Abstract
Content
During the period from 2007 till 2011 a consistent progress was registered at Ford South America plants' Safety Operating System. As result of that, key metrics improved significantly during that period (Ex: 72% reduction of Lost Time Cases and 68% reduction in DART).
This paper intends to explore concepts and tools collected during a benchmarking visit to two facilities: Taubate Powertrain Operation and Camaçari Vehicle Operations, which can help the plants to drive their own Safety Culture improvement.
Meta TagsDetails
DOI
https://doi.org/10.4271/2012-36-0111
Pages
9
Citation
Illi, S., "Safety Cultural Transformation at Ford South American Manufacturing Plants," SAE Technical Paper 2012-36-0111, 2012, https://doi.org/10.4271/2012-36-0111.
Additional Details
Publisher
Published
Oct 2, 2012
Product Code
2012-36-0111
Content Type
Technical Paper
Language
English