Payload Attach System for the ISS - Development and Verification for EVA Operations
Technical Paper
1999-01-2037
ISSN: 0148-7191, e-ISSN: 2688-3627
Annotation ability available
Sector:
Language:
English
Abstract
The process of developing a Payload Attach System (PAS) which will support a wide range of experimental and commercial payloads on the International Space Station (ISS) has experienced an interesting evolution during its design, development, test and evaluation (DDT&E) phase. This evolution has been caused in large measure by requirements intended to insure compatibility of the PAS with the extravehicular activity (EVA) crewmember during nominal and contingency operations in and around the PAS sites. As the design of the ISS transitioned from its Freedom predecessor, the effort to keep costs down by preserving as much of the original Freedom design as possible led to design decisions that challenged engineering thinking. In particular, the decision to preserve the P3 and S3 Pre-Integrated Truss (PIT) segments in their original design configuration presented a challenge to reconcile the Freedom Propulsion Module Attach Structure (PMAS) design with ISS EVA and Attached Payloads requirements.
This paper examines the influence of EVA requirements on the evolution of the PAS design, and the role played by the different EVA analysis tools used by Boeing Extravehicular and Crew Systems (EV&CS) personnel for developing PAS verification activities. Planned PAS verification activities are presented, as are results of analyses and test activities, including neutral buoyancy laboratory (NBL) and human thermal vacuum (HTV) testing at NASA’s Johnson Space Center (JSC). In addition, this paper considers several proposed uses of the PAS design in secondary sites throughout the ISS structure, such as the Spares Warehouse and the Z1 Truss Unpressurized Logistics Carrier Attach System (Z1-ULC-AS).
Authors
Citation
Osorio, G., "Payload Attach System for the ISS - Development and Verification for EVA Operations," SAE Technical Paper 1999-01-2037, 1999, https://doi.org/10.4271/1999-01-2037.Also In
References
- Anderson, dave; EVA Worksite Analysis - Use of Computer Analysis for EVA Operations Development and Execution Boeing Paper MDC 98H1356, presented to the 49 th International Astronautical Congress Melbourne, Australia Sept 28-Oct 2 1998
- Foster, Mark; ISS Truss Attached Payload Accommodations Overview Presentation made at the ISS Symposium in Albuquerque New Mexico, February 1999
- EVA Standard Interface Control Drawing, SSP 30256, NASA Space Station Program document, Revision F August 1997
- International Space Station Flight Crew Integration Standard SSP 50005, NASA Space Station Program document, Rev B November 1995
- Standard Interface Control Document, Integrated Truss Segment P3 and S3 to Attached Payloads and Unpressurized Cargo Carriers SSP 42131, NASA Space Station Program Document, Revision B August 1997
- Attached Payload Hardware Interface Control Document Template SSP 57004; NASA Space Station Program Document November 1998
- Prime Item Development Specification for Integrated Truss Segment P3 SP-M-235J, Specification Number December 1998
- Prime Item Development Specification for Integrated Truss Segment S3, SP-M-229K, Specification Number July 1997
- Segment Specification for the United States On-Orbit SSP 41162, NASA Space Station Program Specification, Revision E July 1996
- Layout, EVA Analysis, S3/P3 Attach Structure Installation Boeing Report MDC 96H0578C December 1998
- Layout, EVA Analysis, S3/P3 Faces 3,4,5 Miscellaneous Maintenance Boeing Report MDC 96H0576B December 1998